Beacon Project Leopoldstraße

All projects
  • Year: since 2021
  • Category: Revitalization
  • Use: Reside, Office, Business
  • Construction: Wood hybrid
  • More details
    Scope
    Feasibility Study for Densification

    Location
    Leopoldstraße 139
    München 

    Gross Floor Area
    Before: ca. 10.250m²
    After: 14.536m² 

    Client
    Art-Invest Real Estate Management GmbH & Co. KG

The feasibility study analyses the development potential of the existing building in Leopoldstrasse. An intelligent extension of the existing structure allows new utilisation possibilities and the creation of a completely new identity.

Redesign

The redesigned base floor links the urban space with the commercial areas and forms a prominent address. The additional floor is also designed with a strongly contrasting form and material language and turns the revitalised existing building into a new identity anchor and beacon project for the neighbourhood.

Revitalisation Programme

A key aspect of the revitalisation programme is the utilisation of the space for different uses. In addition to the commercial space on the ground floor, the number of residential units will be significantly increased and new office space will be added to the existing ones.

The new roof will be turned into a sustainable multifunctional roof and maximised with PV systems, intensive greening and roof terraces. This will counteract the challenges of the heavily sealed urban space and create open space for people, flora and fauna.

This website uses cookies
Detailed information about data protection can be found on the page Datenschutz


This website uses cookies

We use cookies to personalise content and ads, to provide social media features and to analyse our traffic. We also share information about your use of our site with our social media, advertising and analytics partners who may combine it with other information that you’ve provided to them or that they’ve collected from your use of their services.